top of page
Infrastructure and services
Fully equipped utility-wise (roads, water, power, drainage); the first and second stage area of about ca. 5 ha, whose parcels are on sale on favorable terms (final cost with aid: 7.00 HRK/m2).
Services
-
road maintenance and renovation, renovation of traffic signs
-
cleaning of parking surfaces, bus stops
-
operation and maintenance of the public utility system
-
care of green areas/landscape
bottom of page